Campaign now: —Next: —

WhatsApp the export desk+20 122 624 1057

Export

How we export

From the campaign to your port: markets, logistics, documents, quality checks, private label and samples.

Incoterms
FOB, CFR, CIF
Ports of loading
Alexandria or DamiettaExample
Container
20 ft dry, ambient
Transit
7–30 days by route

01

Markets

More than 30 countries, in the regions Al-Fursan lists on its Gulfood 2026 page.

  • 01EuropeRotterdam, Hamburg, Genoa
  • 02North AfricaCasablanca, Tripoli
  • 03West AfricaLagos, Tema, Abidjan, Dakar
  • 04East AfricaMombasa, Djibouti
  • 05Middle East & LevantAqaba, Beirut, Umm Qasr
  • 06GCCJebel Ali, Jeddah, Dammam
  • 07USANew York / New Jersey

Example: Example destination ports, quoted on request.

02

Logistics

Aseptic product travels at ambient temperature: no reefer needed. Drums and bins are palletised, stuffed at the plant and trucked to the port of loading.

03 / Pack to container

From one drum to a full 20 ft.

Three common aseptic formats. Pick one and watch it load. Every figure here is a typical value: confirm yours with the export desk.

01 / UnitAseptic bag in a 220 L steel drum
02 / Pallet4 drums
03 / 20 ft container20 × 4 · stacked two high
Net per unit
235 kg Example
Units per pallet
4 Example
Pallets per 20 ft
20 Example
Units per 20 ft
80 Example
Net per 20 ft
≈ 18.8 t Example

40 ft: usually weight-limited for paste. Ask for your route.

04

Documents

05

Quality checks

  • Raw-fruit selection at reception
  • In-line process data logged electronically
  • Brix, pH, Bostwick and colour per lot
  • Microbiology and commercial sterility
  • Certificate of analysis with every lot

06

Private label / Samples

Private label

Drum labels and carton panels can carry the buyer’s product code, language and lot format. Retail packs are not published: ask the export desk.

Samples

Ask for a sample with your inquiry. It ships by courier with an analysis from the on-site laboratory.

WhatsApp

07

Inquiry to arrival, in eight steps.

  1. 01 / Day 0 Inquiry

    Product, Brix, pack, quantity, port

  2. 02 / Days 3–7 Sample

    Courier sample with lab analysis

  3. 03 / Days 7–14 Confirmation

    Pro-forma, spec sign-off, payment terms

  4. 04 / 2–4 weeks Production

    From stock or the next campaign

  5. 05 / With production QC

    Brix, pH, Bostwick, micro per lot; CoA

  6. 06 / 2–3 days Packing

    Aseptic bag, drum or bin, palletised, labelled

  7. 07 / 1 week Shipping

    Stuffing, customs, sailing from Alexandria or Damietta

  8. 08 / 7–30 days Arrival

    Transit to your port; documents released

Example: indicative timing; varies by product, campaign and route.

Planning next campaign? Book it before the harvest.