A website by Inception GrowthBack to our work
Request a quote

From Turato your port.

How an order leaves Cairo: the markets we ship to, how stone is packed and loaded, which ports and terms, the paperwork, and how long each step takes.

Markets.Five we focus on.

#Duty on Egyptian stoneShips from
01 Saudi ArabiaJeddah · Dammam 0 % GAFTA. Turkish slabs pay 10 %. Sokhna
02 United Arab EmiratesJebel Ali 0 % GAFTA. Turkish slabs pay 5 % (MFN). Sokhna
03 LibyaTripoli · Benghazi · Misrata 0 % GAFTA / COMESA. The largest buyer of Egyptian sawn marble. Alexandria
04 KuwaitShuwaikh · Shuaiba 0 % GAFTA. Egypt holds about 14 % of Kuwait’s slab imports. Sokhna
05 United KingdomFelixstowe · Southampton 0 % UK–Egypt Association Agreement. The second market for Egyptian sawn marble. Alexandria

Duty and market data: export study, from ITC Trade Map, UN Comtrade and WITS (2023–2025). Egypt-wide figures, not the factory’s volumes.

The factory has also shipped to

France · United Kingdom · Bulgaria · Kosovo · Italy · United States · Germany · Belgium · South Korea · Australia · Lebanon · Kenya · UAE · Saudi Arabia — and more than ten other countries.

Packing.Built for sea freight.

Slabs in A-frame bundles

Slabs in A-frame bundles Example

Polished faces paired and separated by spacers, leaning on both sides of a heat-treated wooden A-frame, steel-strapped. Slabs keep their sequence numbers for book-matching.

Tiles in fumigated wooden crates

Tiles in fumigated wooden crates Example

Tiles stacked on edge or flat with foam sheets between faces, in closed pine crates on pallets, about 1–1.4 t each, ISPM 15 stamped wood.

Loaded and braced at the factory

Loaded and braced at the factory Example

Containers are stuffed at the factory gate, crates braced with timber and lashing, then photographed before sealing.

Labelling and private label Example

Each crate is marked with stone, finish, size, quantity, crate number and net and gross weight, in English and Arabic. Your own marks, product names and labels can be applied on request.

Container load.Weight fills it first.

Stone reaches the weight limit before the container is full, so a 40-foot carries about the same tonnage as a 20-foot. Most stone ships in 20-foot boxes.

20 ft40 ft
Payload20–25 t25–26 t
2 cm slabs≈ 430–450 m²≈ 450–480 m²
3 cm slabs≈ 290–310 m²≈ 300–320 m²
2 cm tiles≈ 420–460 m²≈ 450–480 m²
Bundles / crates8–10 / 18–229–11 / 20–24

Example Typical values; they vary by stone and by the shipping line’s weight limit.

Ports and terms.FOB from three ports.

01

Alexandria

Mediterranean. Europe, the UK, Libya, Lebanon, the Americas.

02

Damietta

Mediterranean. An alternative to Alexandria for Europe and the Levant.

03

Sokhna

Red Sea, two hours from the factory. Saudi Arabia, the Gulf, Asia and Australia.

Incoterms EXW Tura · FOB Alexandria, Damietta or Sokhna · CFR and CIF to your port Example

Documents.Ready for your broker.

  1. 01Commercial invoice
  2. 02Packing list, crate by crate
  3. 03Certificate of origin (GAFTA form for Arab markets, EUR.1 for the UK and EU)
  4. 04Fumigation certificate for the wooden packing (ISPM 15)
  5. 05Bill of lading
  6. 06EN test values where published (four stones)

Quality checks. Before it is crated.

  • Block selection Each block inspected at the quarry before it is bought.
  • Slab grading Every slab graded for defects, colour and consistency.
  • Dimensions Thickness, squareness and flatness checked against the cutting list. Example
  • Photos before loading Slab-by-slab and crate photos sent to you before the container is sealed. Example

Samples Example

Cut samples of any stone and finish, about 30 × 30 cm, sent by courier. Photos of the actual slabs in stock on request.

Order to delivery.Eight steps.

Indicative timing for one 20-foot container of standard formats. Example

  1. 01

    Inquiry

    Day 0

    Stone, finish, format, quantity and your port. We reply with a price and photos of the current lot.

  2. 02

    Sample

    3–7 days

    Cut samples of each stone and finish, sent by courier.

  3. 03

    Confirmation

    1–2 days

    Proforma invoice, cutting list and packing plan signed off; deposit.

  4. 04

    Production

    2–4 weeks

    Sawing, finishing and cutting to size in Tura.

  5. 05

    Quality check

    1–2 days

    Slabs graded for defects, colour and consistency; dimensions checked; photos sent to you.

  6. 06

    Packing

    2–3 days

    A-frame bundles and fumigated crates, marked crate by crate to the packing list.

  7. 07

    Shipping

    3–20 days at sea

    Loaded at the factory, trucked to Alexandria, Damietta or Sokhna, documents couriered or sent electronically.

  8. 08

    Arrival

    At your port

    Your broker clears the goods with our certificate of origin and packing list.

Quarried in Egypt.Shipped everywhere.