How an order leaves Egypt
Markets, logistics, documents, quality checks, private label and samples: the whole route from your enquiry to the container at your port.

01
Markets
Egypt sits between three trading regions. Goods of Egyptian origin trade duty-free within the Greater Arab Free Trade Area with a certificate of origin, and enter the EU under the EU–Egypt Association Agreement with an EUR.1.
02
Logistics
Containers are loaded at the factory or the port and sealed. Mediterranean ports put Southern Europe within a week by sea.
Ports of loading Example
- Alexandria
- Damietta
- Port Said East
Incoterms
- EXW · FOB · CFR · CIF
- EXW factory, FOB Egyptian port, CFR or CIF to your port.
Typical container loads Example
| Per pallet | 20ft | 40ft | |
|---|---|---|---|
| Glass jar · 370 ml · 720 ml | 100 cartons | 12,000 jars | 24,000 jars |
| Catering tin · A10 · 3 kg | 60 cartons | 3,600 tins | 7,200 tins |
| Plastic pail · 5 kg · 10 kg | 48 pails | 480 pails | 960 pails |
| Bulk drum · 220 L | 4 drums | 80 drums | 80 drums |
03
Documents
- Commercial invoice
- Packing list
- Certificate of origin (EUR.1 for the EU, Arab certificate of origin for GAFTA)
- Bill of lading
- Health certificate
- Certificate of analysis per lot
- Pasteurisation record
- Brine analysis (salt, pH)
04
Quality checks
- Raw olives graded by size (count per kg)
- Brine salt and pH checked per lot
- Drained weight and seal checked per pack
- Certificate of analysis per lot

05
Private label
Your brand on the jar, tin or pail. Send your artwork, label size and market; the label is prepared for that market’s rules.


06
Samples
A sample in your chosen pack, with its spec sheet, before you confirm. Courier costs are agreed per request.
From spec to a loaded container
Order phases / 01–08
- InquiryProduct, pack, quantity, port and Incoterm.Day 0–2
- SampleIn your pack size, with its spec sheet.5–10 days
- ConfirmationProforma invoice, label artwork, payment terms.2–3 days
- ProductionGrading, brining, filling and pasteurising.2–3 weeks
- Quality checkLot testing: salt, pH, drained weight, seal.2–3 days
- PackingLabelling, cartons, pallets, stretch wrap.2–4 days
- ShippingContainer loaded and sealed at the port.Med 5–10 · Gulf 10–18 · Americas 20–30 days
- ArrivalOriginal documents for customs clearance.On arrival
Example