A website by Inception Growth Back to our work

--:-- Damietta
Hotel Suite

Hospitality · Simplified French classic, or to your drawings

Hotel Suite

Model references: On request

Classic suites for hotel projects: one design repeated room after room without differences, built from your designer’s drawings after a model room is approved.

Sold by
Per room
Minimum Example
20 rooms per project, after a model room
Lead time Example
60–90 days per 50 rooms
  • Shipped FOB Damietta, CFR or CIF to your port
  • Arab certificate of origin for duty-free entry in Arab markets
  • Made to order: size, finish and fabric can change

Look closer

Tap the piece. See the hand.

A hotel project needs two things: one design repeated across dozens of rooms, and a fixed delivery date. We build the model room first; once approved, the run follows in the same wood, colour and fabric, numbered by floor and room for fast fitting on site.

Hotel Suite
  1. Rocaille shells and acanthus cut into kiln-dried beech with gouges, one facet at a time.

  2. Loose gold leaf laid on a prepared ground, then burnished on the high points and left soft in the hollows.

  3. Silk damask, cotton velvet or your own fabric, fitted by hand with piping and braid.

  4. Hand-cut dovetails in beech drawers: the joint holds for decades, without screws in sight.

Tap a point on the piece to see the craft at close range.

Woods & finishes

  • Beechkiln-dried, frames and carving
  • Pineinner frames and carcasses
  • Oakkiln-dried, doors and desks
  • Champagne gold
  • Ivory lacquer
  • Walnut stain

Upholstery

  • Contract fabrics, flame-retardant to your project specification
  • Velvet or damask headboards

Pieces in the set Example

  • King bed with headboard
  • 2 nightstands
  • Writing desk and chair
  • Wardrobe
  • Luggage bench
  • TV unit

Dimensions

Model room
20–30 days after drawings are approvedExample
Bed
200 × 200 cm, headboard H 160 cmExample

Specification

Style
Simplified French classic, or to your drawings
Woods
Beech · Pine · Oak
Finishes
Champagne gold · Ivory lacquer · Walnut stain
Upholstery
Contract fabrics, flame-retardant to your project specification · Velvet or damask headboards
Pieces in the set
King bed with headboard · 2 nightstands · Writing desk and chair · Wardrobe · Luggage bench · TV unit Example
Dimensions · Model room
20–30 days after drawings are approvedExample
Dimensions · Bed
200 × 200 cm, headboard H 160 cmExample
Model references
On request
Sold by
Per room
Minimum
20 rooms per project, after a model room Example
Lead time
60–90 days per 50 rooms Example
Origin
Made in Egypt (Damietta)

Export

How we export it

Packing & labelling

Assembly
Knocked-down, numbered by floor and room, with fittings per room Example
Protection
Blanket wrap, then carton, then a fumigated wooden crate (ISPM 15) for gilded and carved pieces
Labelling
Each carton and crate is marked with item code, set number, piece count, gross and net weight and destination; your brand and codes on request.

Container load Example

40ft high cube
About 12 rooms
20ft standard
About 5 rooms
Mixed container
Several collections in one container; one set per model is fine

Incoterms · Port of loading

Incoterms
EXW factory · FOB Damietta · CFR / CIF your port
Port of loading
Damietta (main) · Alexandria or Port Said East on request · by road to Libya via Salloum
Sea transit Example
Jeddah 4–6 days · Aqaba via Nuweiba · Jebel Ali 12–16 · Umm Qasr / Shuwaikh 15–22

Export documents

  • Commercial invoice
  • Packing list
  • Certificate of origin (Egypt)
  • Arab (GAFTA) certificate of origin, for 0% duty in Arab markets
  • Fumigation certificate, ISPM 15-marked crates
  • Bill of lading (sea) or CMR (road)
  • Iraq: certificate of conformity (CoC) under the Iraq VoC programme
  • Saudi Arabia: SABER check, where the national line is regulated

From inquiry to arrival Example

  1. Inquiry Day 0–2 Codes, photos or drawings; we reply with prices and a container plan.
  2. Sample Week 1–3 One set or a model room, approved before the run.
  3. Confirmation Week 3 Proforma invoice, deposit, final drawings and fabrics.
  4. Production Week 3–8 Carving, gilding, finishing and upholstery.
  5. Quality check Week 8 Every set checked against the approved sample; photos sent.
  6. Packing Week 8–9 Wrap, carton, crate, labels and loading plan.
  7. Shipping Week 9 Loaded at the factory, documents issued.
  8. Arrival +4 to 20 days by sea Jeddah about 4–6 days; Gulf and Umm Qasr longer.

HS code & origin

HS codes follow the 2022 nomenclature at six digits. Your importer’s national line may add digits.

HS 9403.50
Wooden bedroom furniture
HS 9403.60
Other wooden furniture (desk, wardrobe, TV unit)
HS 9401.61
Upholstered seats with wooden frames
Origin
Made in Egypt (Damietta) · Arab (GAFTA) certificate of origin, for 0% duty in Arab markets

Questions importers ask

Do you work from the designer’s drawings?

Yes. We receive drawings and specifications, return shop drawings for approval, then a model room before the quantity.

Is the delivery date written in the contract?

Yes, it is fixed in the contract after the model room is approved and tied to the shipping schedule.

Can shipments be split by floor?

Yes, floors can ship in phases to follow the fit-out schedule on site.

Related collections

Visit the workshop, or start with a quote.

Tell us the models, the quantities and your port. We reply with prices, a lead time and a container plan.